Plenum ventilation in buildings
Plenums are air compartments or chambers that are sometimes found in buildings, either above suspended ceilings, in the gap between the ceiling and the floor slab, or below raised floors in the gap between the raised floor and the floor slab. They form part of the ventilation system for the building.
They may be supply or return plenum, and may serve either an entire building, or a specific zone in a building. Supply plenum supply ventilation air to the occupied space, whilst return air is generally extracted through ductwork. Conversely, in return plenum the air is generally ducted to the space, whilst the return air is extracted through the plenum.
Plenum can be combined with thermal mass to help moderate peak conditions, or to allow night time purging. See thermal mass for more information.
Underfloor air distribution (UFAD) uses the underfloor plenum beneath a raised floor to provide ventilation air through floor diffusers directly to the occupied zone. The air spreads across the floor forming a reservoir of fresh, cool air. Any sources of heat (such as people or computers) generate a thermal plume lifting contaminated air to high level where it can be removed from the space. See Underfloor air distribution for more information.
Plenum can give good flexibility for the layout of buildings. However, they can provide a space within which fire can spread, particularly because of the air supply they offer, and so they may be required to include fire and smoke detection, and potentially combustible material (such as cables) may be controlled. They can also create a pathway for the transmission of sound between separate spaces.
The inclusion of dampers and acoustic attenuators can be beneficial, but this results in pressure losses. Good air-tightness is required to the plenum construction to optimise performance.
It is important to ensure that spaces above suspended ceilings and below raised floors do not inadvertently become plenum as a result of the disconnection of, or damage to ductwork.
NB the phrase ‘open plenum’ can be used to describe buildings in which there is no suspended ceiling, but instead the floor slab and services are exposed giving an ‘industrial’ look.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Active thermal mass.
- Air handling unit.
- Chilled beam.
- CIBSE Case Study Olympic Velodrome.
- CIBSE Case Study Ortus Learning and Events Centre.
- Ground preconditioning of supply air.
- Herringbone strut.
- HVAC.
- Floating floor.
- Floor plenum airtightness.
- Mechanical ventilation.
- Night time purging.
- Raised floor.
- Sprung floor.
- Suspended ceiling.
- Thermal labyrinth.
- Thermal mass.
- Underfloor air distribution
- Ventilation.
Featured articles and news
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.